Invalid date. This is not a valid date, or it is outside the range for dates. Type a date in the correct format: for example, 6/15/29 or June 15, 2029.
Invalid cost. This is not a valid value, or it is outside the range for this field. Type the amount of the cost in numbers.If ...
Invalid cost.}This is not a valid cost value, or it is outside the range for this field. Type the amount of the cost in numbers. ...
Invalid date. This is not a valid date, or it is outside the range for dates, which is from {0} through {1}.Type a date in ...
Invalid date. This is not a valid date, or it is outside the range for dates, which is January 1, 1984 through December 31, ...
Invalid date. This is not a valid date, or it is outside the range for dates. Type a date in the correct format: for example, ...
Invalid date.}This is not a valid date or it is outside the range for dates, which is January 1, 1984, through December 31, ...
Invalid delegation dates. The end date must be greater or equal to the start date and greater or equal to the current date. ...
Invalid duration. This is not a valid duration, or it is outside the range for this field. Type a duration in the correct ...
Invalid duration. This is not a valid duration, or it is outside the range for this field.Type a duration in the correct ...