If cost is calculated based on pay, specify how the value of standard time is included in the calculation. The following ...

If cost is calculated based on pay, specify how the value of standard time is included in the calculation. The following options are available: Yes (the value is included directly in the period during which the cost was generated), Allocation (the value is distributed among the various jobs of the day; the net time of each job is used as the allocation key), and No (the value is not included in cost calculations).
English
English (United States)
日本語
Japanese