If cost is calculated based on pay, specify how the value of manual premiums is included in the calculation. The following ...

If cost is calculated based on pay, specify how the value of manual premiums is included in the calculation. The following options are available: Yes (the value is added to a specific job, if a job is selected for the Transaction ID reference in the Number sequences area), Allocation (the value is distributed among the various jobs of the day; the net time of each job is used as the allocation key), and No (the value is not used in cost calculations).
English
English (United States)
日本語
Japanese