The result of the budget checking. A red X indicates that the budget check failed. A yellow triangle indicates that the budget ...

The result of the budget checking. A red X indicates that the budget check failed. A yellow triangle indicates that the budget check passed with warnings, and a green check mark indicates that the budget check passed. This field is blank if the budget checking is not performed. Budget checking is available when budget control is turned on, and Purchase orders and Enable budget control for line item on entry are selected in the Select source documents area of the Budget control configuration page. Budget check results are affected by project budget control settings, over-budget permissions, and other budget control parameters and settings.