The time that is required to produce the quantity defined in the Process qty. field. If you enter a value, the process time for performing the operation is included in the estimate. The time is scheduled based on the availability of the resource. The time is also included in the capacity loading of the resource when the production order is scheduled. The value in the Run time field must be larger than 0 (zero). If you have not entered a recalculation factor in the Hours/time field on the Times tab, the system calculates the run time in hundredths of an hour. The system also calculates the run time in hundredths of an hour if a conversion factor has been specified in the Hours/time field in the Relations page or the Resources page. The value in the Hours/time field in the Relations page overrules the value in the Resources page. The time is scheduled according to the routing group for the operation. The time is calculated as follows: Run time * (Load / 100) * (1 + Accumulated) * Quantity / Process qty. If you select Capacity in the Formula field, the system enters the value 1 in the Run time field, and calculates the process quantity by using the value in the Factor field and the number of capacity units specified for the current operations resource in the Capacity field.
The time that an operation waits before it can begin. This time is scheduled according to the Gregorian calendar and can ...
The time that is required to produce the process quantity. If a conversion factor is not specified in the Hours/time field ...
The time that is required to produce the process quantity. If a factor is not specified for the operation relation or the ...
The time that is required to produce the process quantity. If a factor is not specified for the operation relation or the ...
The time that is required to produce the quantity defined in the Process qty. field. If you enter a value, the process time ...
The time that is required to receive the standard order quantity of the product. This information is used during item arrival. ...
The time that the items wait after the operation is finished before the next operation can start. The value must be positive, ...
The time to wait before the operation can be started. The value in the field must be positive. Set up this value in the route ...
The TimeAttPeriodLine table contains calendar period transactions. A calendar period has a period frquency that is used to ...