The type of resource that will be used for the operation. The resource type can be one of the following: Vendor (the resource ...

The type of resource that will be used for the operation. The resource type can be one of the following: Vendor (the resource is an external operations resource, such as a contractor), Human resources (the resource is one or more workers), Machine (the resource is a production machine), Tool (the resource is an instrument or device that can be considered a tool), or Location (the resource is a physical location, such as an assembly area, of a certain size).
English
English (United States)
日本語
Japanese