The Resource Initials field lists the abbreviations for the names of resources assigned to a task. These initials can serve as substitutes for the names.
The resource cannot be found. The resource with the specified GUID {0} does not match to an existing resource in the Project ...
The resource cannot be imported.}This resource name is invalid, or a duplicate of another resource selected for import or ...
The resource does not exist.}Try one of the following: \225 Check to see whether you typed the correct ID number. \225 If ...
The resource global is already checked out to another user.}You may retry accessing the enterprise resource pool or cancel ...
The Resource Initials field lists the abbreviations for the names of resources assigned to a task. These initials can serve ...
The resource is assigned outside the original dates for task ^1 in project \"^2\".}The duration of this fixed-duration task ...
The resource list is too long.}A resource list that contains more than 256 characters cannot be edited or deleted or used ...
The resource name already exists.} Enter a different resource name, and then try again. If the problem persists, please contact ...
The resource name is not recognized by Project Server.}Check the spelling of the name, making sure it does not contain the ...