The time that is required to produce the process quantity. If a factor is not specified for the operation relation or the resource, the Run time field is expressed in hours with two decimals. If a value is specified in the Hours/time field for the operation relation, that value overrides the Hours/time value for the resource. The Process qty. value must be a positive value. For a description of conversion to other time intervals, see the description of the Hours/time field. The operation's Route groups page determines how time is scheduled. The system calculates time as follows: run time * load * (1 + accumulated) * Quantity / Process qty. If you selected Capacity in the Formula field for the production route, run time is always set to one and the process quantity is calculated based on the factor with the number of capacity units that you specified for the current resource.
The time period in days, going forward from today, when delayed demand orders are considered an issue. This applies only ...
The time period in days, going forward from today, when delayed supply orders are considered an issue. This applies only ...
The time that an operation waits before it can begin. This time is scheduled according to the Gregorian calendar and can ...
The time that is required to produce the process quantity. If a conversion factor is not specified in the Hours/time field ...
The time that is required to produce the process quantity. If a factor is not specified for the operation relation or the ...
The time that is required to produce the process quantity. If a factor is not specified for the operation relation or the ...
The time that is required to produce the quantity defined in the Process qty. field. If you enter a value, the process time ...
The time that is required to receive the standard order quantity of the product. This information is used during item arrival. ...
The time that the items wait after the operation is finished before the next operation can start. The value must be positive, ...