The status of the postdated check: Open (the postdated check is created and is associated with a payment), Posted (the vendor payment journal is posted), Cancelled (tThe postdated check is canceled after posting, and the corresponding general ledger entries are reversed), Transferred to accounts payable (the postdated check is transferred to the vendor payment journal), On hold (the postdated check is on hold), Replaced (the postdated check is replaced by another check; the status of the original check changes from Cancelled to Replaced), or Paid (the postdated check is cleared by the bank after the maturity date).
The status of the line with regard to shipping and receiving updates. The following statuses are used: Shipping updates (the ...
The status of the mass hire project position. If the status is Closed, that means that the person has been hired to fill ...
The status of the picking route or, in the Lines section, for the individual lines. In the Overview section status is based ...
The status of the postdated check: Open (the postdated check is created and is associated with a payment), Posted (the customer ...
The status of the postdated check: Open (the postdated check is created and is associated with a payment), Posted (the vendor ...
The status of the production flow version. The following values are used: Active (the production flow version is activated) ...
The status of the production job. 1 indicates that the worker no longer works on the job, but it has not yet been reported ...
The status of the production job. A status of 1 indicates that the worker no longer works on the job, but the job has not ...
The status of the production job. The following values are available: Coming (displayed until the job is started), Waiting ...