Select one of the following column types: Line number (the line number of the report column), Name (the name of the report ...

Select one of the following column types: Line number (the line number of the report column), Name (the name of the report column), Costs, fixed (the realized or planned fixed costs on a report column), Costs variable (the realized or planned variable costs on a report column), Total costs (the realized or planned total costs on a report column), Quantity (the realized or planned quantities on a report column), Column calculation (a column that is calculated based on other columns; the current calculation is specified by a calculation expression in columns 1 and 2), or 100% (a calculation of the cost line's share of the 100% cost line in the column that is marked on the line in Percentage column).
English
English (United States)
日本語
Japanese