The type of work that is performed. The task type can be one of the following: Queue before (waiting time before the operation ...

The type of work that is performed. The task type can be one of the following: Queue before (waiting time before the operation can be started), Setup (fixed time used for clearing an operations resource before the operation is started), Process (the time required to perform the operation), Overlap (the operation can begin before the previous operation is finished), Transport (the time required to transfer the items to the next location, which can be the next operations resource, the production route, or stock), or Queue after (after the operation is finished, the time that items must wait before the next operation can start).
English
English (United States)
日本語
Japanese