Select this option to enable automatic consumption of the estimated setup time when a production is started or reported as ...

Select this option to enable automatic consumption of the estimated setup time when a production is started or reported as finished. Estimated consumption is transferred to the consumption journal, which is then posted to the ledger either automatically or manually. Consumption is registered for the production when route journals are posted. You can override this setting when you start a production or report it as finished. Select this option if the calculated time should be fully consumed so that the setup time is not calculated. Additionally, select this option if consumption is at least equal to the estimated setup time. In this case, feedback can override the estimated consumption. If, for example, feedback on the setup time for an operation is equal to or less than the estimated setup time, the consumption is still added to the estimate. That is, the selection of resources is enabled for setup time for the positive difference between the calculated setup time minus the registered consumption transactions of setup time. If the consumption transactions for setup time are greater than the estimated transaction, the consumption of setup time is the registered consumption transactions.
English
English (United States)
日本語
Japanese