The reference level that is assigned to the selected production. The reference level indicates the hierarchy of a production and any related sub-productions. Main productions are assigned the level 0 (zero). Referenced sub-productions are assigned increasingly greater levels based on the BOM hierarchy. Reference levels are assigned automatically when a production is estimated.
The reduction entry document can't be updated because the assets already have a reduction entry document asset and the subsidy ...
The reduction entry document can't be updated for fixed assets %1, %2, and %3 because the assets already have a reduction ...
The reference ID does not map to a valid entity key. Check the relationship metadata. Service: %1, DataSource: %2, Field: ...
The reference ID maps to more than one entity key. Check the relationship metadata. Service: %1, DataSource: %2, Field: %3 ...
The reference level that is assigned to the selected production. The reference level indicates the hierarchy of a production ...
The reference table %1 was not found in the project. The parameterized query associated to the field %1.%2 was not imported. ...
The reference to the consolidation opportunity. This field displays a value only if the purchase requisition line was added ...
The reference to the matched record. On a stop job registration, this field will show the record ID of the corresponding ...
The reference type based on the purpose of the batch order. For example, if the batch order is created to an order line, ...