The resource is assigned outside the original dates for task in project. The duration of this fixed-duration task will change to accommodate the resource assignment.
The resource cannot be found. The resource with the specified GUID {0} does not match to an existing resource in the Project ...
The resource does not exist. Try one of the following: Check to see whether you typed the correct ID number. If you want ...
The resource does not exist.}Try one of the following: \- Check to see whether you typed the correct ID number. \- If you ...
The resource global is already checked out to another user.}You may retry accessing the enterprise resource pool or cancel ...
The resource is assigned outside the original dates for task in project. The duration of this fixed-duration task will change ...
The resource is assigned outside the original dates for task ^1 in project \"^2\".}The duration of this fixed-duration task ...
The resource list is too long. A resource list that contains more than 256 characters cannot be edited or deleted or used ...
The resource list is too long.}A resource list that contains more than 256 characters cannot be edited or deleted or used ...
The resource name is not recognized by Project Web App.}Check the spelling of the name, making sure it does not contain the ...