The priority of the capability. A value of 1 is the highest priority, and then 2, 3, and so on. If multiple resources have ...

The priority of the capability. A value of 1 is the highest priority, and then 2, 3, and so on. If multiple resources have the same capability and can fulfill the level criteria, the resource with the lowest value in the Priority field is selected first when production is scheduled.
English
English (United States)
日本語
Japanese