Repair was not completed because of errors. If logging was enabled, check the log for errors. If logging was not enabled, please repeat installation with logging enabled.
Reopen the document to change it after it has been approved. Approved documents have the Released status and must be opened ...
Reopen the incoming document record after it has been approved by the incoming document approver. Note that this is not related ...
Reopen the time sheet, for example, after it has been rejected. The approver of a time sheet has permission to approve, reject, ...
Repair the Dynamics 365 Server installation. This operation reinstalls application files. It does not repair the Dynamics ...
Repair was not completed because of errors. If logging was enabled, check the log for errors. If logging was not enabled, ...
Replace items that are no longer used in production BOMs. You can exchange an item, for example, with a new item or a new ...
Replace the beginning and ending text that has been defined for the related finance charge terms with those from different ...
Replace the beginning and ending text that has been defined for the related reminder level with those from a different level. ...
Replenishment System for Item %1 is Prod. Order, but the item does not have a production BOM. Verify that this is correct. ...