{The calendar \"^1\" used for the monthly report no longer exists.}Try the following: \225 To base the report on a different calendar, click the report again, click Edit, and then in the Calendar box, click a different calendar. \225 Recreate the base calendar the report is based on. On the Tools menu, click Change Working Time, and then Click New.
The calendar for the selected resource cannot be modfied, due to an invalid resource name or deleted resource. Check this ...
The calendar name is not valid. It might include a character that is not allowed (for example, &), or there might be a calendar ...
The calendar you deleted was in use by Project, so all occurrences of the calendar \"^1\" will be replaced by the Standard ...
The calendar you have specified already exists. To change this calendar, go back to Step 1, and choose 'Edit existing calendar' ...
The calendar \"^1\" used for the monthly report no longer exists.}Try the following: \225 To base the report on a different ...
The change to the WBS Code Definition has resulted in tasks with WBS codes greater than 255 characters.}Project can only ...
The Clipboard cannot be opened.}Try the following: \225 If another program is using the Clipboard, wait for the operation ...
The code mask cannot contain gaps. Begin the code mask at the first level and work toward the last level, without skipping ...
The code mask for all lookup tables of type other than text can only be one level. Specify a code mask with only one level ...