The setup time, which must be a positive value, is the fixed time it takes to prepare a resource. The time is scheduled according ...

The setup time, which must be a positive value, is the fixed time it takes to prepare a resource. The time is scheduled according to the calendar for the resource and is independent of the production quantity. In scheduling, a capacity load is also registered for the time on the resource. The setup time is filled in automatically with the setup time specified for the operation route when you select the operation route. However, the setup time can be changed in the current production route.
English
English (United States)
日本語
Japanese