The quantity that is calculated as safety stock for the period that is defined by the Demand period start date and Demand period end date fields. Safety stock is calculated only if this parameter is defined in the kanban quantity calculation policy that is referenced.
The quantity received or issued, and the cost, in the form of an amount. The cost per unit is recalculated if you change ...
The quantity required for this item is based on percentage of the total formula size, which is defined for the formula. You ...
The quantity specified in the Move quantity field is larger than the total quantity in the %1 field. Enter a smaller quantity ...
The quantity that is available physical on the exact dimensions displayed. This is not always the quantity that can be reserved ...
The quantity that is calculated as safety stock for the period that is defined by the Demand period start date and Demand ...
The quantity that is physically available in the bulk unit. If the packed item is not associated with a bulk item, the unit ...
The quantity that is used as the basis for cost estimating. This quantity can differ from the quantity that has been planned, ...
The quantity that is used to generate an output pallet transport, if the quantity is available. If a pallet in a bulk location ...
The quantity that is used when the specified miscellaneous charges are allocated to the price per unit. This field is used ...