Specifies the total WIP Cost amount that was last posted to the G/L for the job. The WIP Cost Amount for the job is the value ...

Specifies the total WIP Cost amount that was last posted to the G/L for the job. The WIP Cost Amount for the job is the value WIP Cost Job WIP G/L Entries less the value of the Recognized Cost Job WIP G/L Entries. For jobs with WIP Methods of Sales Value or Percentage of Completion, the WIP Cost Amount is normally 0.
English
English (United States)
Deutsch (Deutschland)
German (Germany)
Español (España)
Spanish (Spain)
Français (France)
French (France)
italiano
Italian
Русский
Russian