This field, together with the Master plan field, contains the reference system for the master scheduling proposal. If the ...

This field, together with the Master plan field, contains the reference system for the master scheduling proposal. If the production was derived from the Item requirement statistics page, the field will contain the number of the planned order that generated the production. If the field is blank, no reference exists for the planned order.
English
English (United States)
日本語
Japanese