The Successors field lists the WBS (work breakdown structure) codes associated with the successor tasks. Each successor is linked to the task by a specific type of task dependency and a lead time or lag time.
The Stop field shows the date that represents the end of the actual portion of a task. Typically, Project calculates the ...
The submitted timesheet contains lines which either are pending approval or have been rejected. You must either delete these ...
The Subproject File field contains the name of a project inserted into the active project file. The Subproject File field ...
The Successors field lists the task ID numbers for the successor tasks to a task. A task must start or finish before successor ...
The Successors field lists the WBS (work breakdown structure) codes associated with the successor tasks. Each successor is ...
The SV (earned value schedule variance) field shows the difference in cost terms between the current progress and the baseline ...
The SV (earned value schedule variance) field shows the difference in cost terms between the current progress and the baseline ...
The SV% (schedule variance percent) field shows the ratio of schedule variance (SV) to budgeted cost of work scheduled (BCWS), ...
The synchronization failed because the Active Directory group was not found. If the Active Directory group no longer exists, ...